Variance Analysis

June 29th, 2009 § Leave a Comment

If projects went exactly as planned, this tool would be unnecessary. Variance Analysis is the comparison of planned results and actual results. The planned results may be found in the Project Management Plan and compared to work performance information. The project manager should be certain that the data itself is trustworthy, and then examine how much variance exists between planned and actual results. Then, the potential impact and causes of any variance should be analyzed, along with determining what action may be needed. Variance Analysis is listed in the fourth edition PMBOK® as a tool of Control Schedule, Control Costs, Control Scope, Report Performance, and as part of the Monitor and Control Risks process. When Earned Value Management is utilized, the formulas of SV and SPI can indicate schedule variance and the formulas of CV and CPI can indicate cost variance. The results of a Variance Analysis may be found in a project’s Performance Reports.


Tagged: , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <pre> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

What’s this?

You are currently reading Variance Analysis at TAPUniversity's Blog.

meta